Carlisle Lake Construction Project
Many improvements have been made at Carlisle Lake including: a concrete RV pad poured for the park caretaker; behind the pad, a shop built for storage; main entry gate added; the playground has two new pieces of equipment, and was expanded with wood chips and new grass; parking lot sealed; boundary rocks replaced the enclosing jersey barriers; bollards installed at trail entrance; topdressing rock added to the trails; light poles added near the playground. All possible through volunteer effort and a legislative grant sponsored by our local Legislators and Senators.
|
Public RestroomsCarlisle Lake has permanent bathrooms! Provided through a Lewis County grant and the craftsmanship of local contractor, Paul Sneed of Sneed Construction.
|
|
Nature TrailThe 0.9 mile trail around Carlisle Lake is maintained by volunteers. In 2021, Elliot Construction widened the east side of the trail. Thanks to their hard work, we can all enjoy easier trail and lake access!
|